2024 Update:
Outside steering position fitted, (type hydraulic system steering) throttle controls still only in decks house.
Autopilot fitted.
Both fuel injection pumps removed and serviced.
AIS transponder fitted.
Front electric WC fitted and fold down washbasin with hot and cold water.
Small side decks sealed and all deck leaks sorted.
Francis searchlight fitted.
Flag pole extended to original size.
Covers made for: decks house, outside seas, outside table, and other areas.
First we started in the front cabin. clean out the bilges, sand and paint the front cabin completly.
Two of the diesel tanks were rusty, so bad you could push your finger into the top. It was decided to remove all four tanks and replace with two new ones, + new fuel pipes and filters. A stainless steel waste tank was also fitted
The master cabin has been altered back to how it was originaly, two bunks one on each side. But we found rot in the hatch and on some of the hand rail mounts.
Refit the chromend windows with new glass and seals. Completed
Varnish decks house doors all workiing and locking. Completed
Sort floor in shower room fit shower and wash basin. completed
Radiators fit and connect. Completed December 2017
Gally work top and sink have to be sorted. Completed
Paint top of decks house. Completed
Varnish decks house. 5 coats on, Now 15 coats sep.2020
Hatches in decks house floor, access to Gen / oil fill and dip stick Completed
Paint hand rail. Completed
fit carpets. still waiting
Clean up engines. Completed
Clean up and oil mast. Completed
Order sails, sort rigging, Waiting for delivery...Delivered !!
Seats inside and decks house. Reay to fit...fittted
Order covers and dogger, and sail covers.
fFit new boiler and add radiator for front cabin Completed
Fit TV and arial Completed
GPS and AIS Completed
Wifi system and arial Completed
Fit out side steering position Completed
Wooden boxs for seats outside Completed
Out side table Completed
Out side seat backs and cusions.